Work planned for the week ahead on the town's 2020 project is:
- Move the two-way traffic lights ready for the next phase of works on Castle Street
- The following work will take place on the west side of Castle Street from Parade Street, heading north:
- install kerbs
- prepare and install paving
- trial holes on Bridge Street (west side) and excavate for kerbs
- prepare and install paving outside of the Town Hall (if the scaffolding has been removed)
No comments:
Post a Comment