Get in touch ...

Know of something happening in
Llangollen?
Tweet
us on
@llanblogger

E-mail your contributions to: llanblogger@gmail.com

We are on Facebook at https://www.facebook.com/pages/llanbloggercouk/139122552895186



Sunday, September 19, 2021

Call for meeting over "perfect storm" of roadworks


* A sign warning of the A5 roadworks ahead. 

A town councillor has called for a high-level meeting of the main agencies involved to address what he has branded the "perfect storm of roadworks" facing Llangollen.

On Friday llanblogger reported how Stuart Davies was asking national roads bosses to "get their act together" to manage major traffic congestion in the town.

Earlier that day roadworks on the A5 just out of town, which are being carried out to strengthen the retaining wall and are due to last for 33 weeks, caused gridlock along Regent Street as heavy Friday afternoon traffic queued in both directions to negotiate the temporary lights just after the Birch Hill junction.

It is believed the jams were the result of a temporary fault with the lights.

At one stage around 3.30pm vehicles lining up in Castle Street to turn left onto the A5 missed numerous changes of the lights as they were unable to move freely out into the flow on the trunk road.

In a fresh statement sent to county and town council officials, along with the area's MP and MS and copied to llanblogger, Cllr Davies says: "It's coming to pass, the perfect storm of gridlock in Llangollen and area. 

"I wrote to you all a few weeks ago predicting this would happen and now it is. 

"The North and Mid-Wales Traffic Agent (NMWTRA) works on the A5 leading to tailbacks with police having to get involved to attempt to solve it, the gridlock on the A5 impacting on Castle Street with up to eight traffic light cycles to allow traffic on to the A5. 

"Now we get a statutory order, a TTO (Temporary Traffic Order) basically banning parking throughout Llangollen town centre for six months to allow the 2020 works, this stopping residents from parking outside their houses. 

"Also a TTO has surfaced from NMWTRA about traffic light replacement on the junction with Castle Street. Then the night closure of the A483 plus minor works on the A539 plus the closure of the minor Bont Road near Froncysyllte plus the landslip at Newbridge.

"Then we have the issue of the inset near the town hall with officers charging ahead without any feedback to the concerned public."

He added: "No statutory consultation regarding the TRO to allow the 2020 works to go ahead has been seen either.

"What on earth is going on? 

"I am calling on Denbighshire County Council (DCC) to repeat their consultation exercise to ensure the statutory TRO consultation is a meaningful one and to ensure the public fully understands and agrees the actions you are taking.

"Plus I am calling for all stake-holders to get a high level meeting with DCC, Wrexham County Borough Council, the Welsh Government and North Wales Police to make sure that they are all aware of the consequences and impact of their isolated planning.

"At the moment there is no joined up thinking with each agency doing their own thing and residents of Llangollen and the surrounding area being impacted."

Saturday, September 18, 2021

Roadworks alert for Berwyn Street

Latest local roadworks alert from one.network is:

 

Berwyn Street


20 September — 31 March

 

Delays likely - Traffic control (multi-way signals)

 

Works description: To upgrade the existing traffic signals at A5 Castle Street Junction including re-location of the Eastern Traffic Head. Works have been co-ordinated with Denbighshire County Council Castle - Street Environmental Scheme (Llangollen 2020)

 

Works location: A5 Junction of Berwyn Street with A539 Castle Street, Llangollen

 

Public facing description: one.network has automatically assigned a category of Unclassified works to this Works based on the information available. Please note: Works Descriptions are not published by Welsh Government.

 

Responsibility for works: Welsh Government

 

Current status: Planned work about to start

 

Works reference: PD505211069250489

 

 


Friday, September 17, 2021

Councillor calls for action as town faces traffic gridlock

 * Traffic queuing in both directions along Regent Street around 3.30pm today.

A town councillor is calling on national roads bosses to "get their act together" to manage major traffic congestion in Llangollen.

Earlier today the roadworks on the A5 just out of town, which are due to last 33 weeks, caused gridlock along Regent Street as heavy Friday afternoon traffic queued in both directions to negotiate the temporary lights set up just after the Birch Hill junction.

At one stage around 3.30pm vehicles lining up in Castle Street to turn left onto the A5 missed two or three changes of the lights as they were unable to move freely out into the flow on the trunk road.

Later a police officer was seen speaking to a person connected with the roadworks.

Town councillor Stuart Davies said in a statement to llanblogger: "The perfect storm is happening here and now, something I warned about weeks ago. 

"Llangollen is being gridlocked as the work on the eastern end of the A5 is carried out.


"Police were spotted actually having to do some traffic control, something not usually seen today."


He added: "Things were at a a standstill today in Llangollen as the works traffic management failed to cope with the density of traffic as the UK public tasted a little bit of post-lockdown freedom.


"The North and Mid Wales Traffic Agency (NMWTRA), who will have commissioned the works, are responsible.


"More thought should have been given to the volume of traffic using the A5 after the Covid lockdown. 


"Better ways of managing the traffic flow or timing should have and should be considered.


"When the Denbighshire County Council (DCC) works in Castle Street start, as I have said before, with the A5 works, overnight A483 closures and single lane working in Castle Street the perfect storm is going to get worse.


"I am calling on NMWTRA officers to get their act together and work with DCC and North Wales Police to solve this problem.


"I am also calling on our elected representatives at county level to do bring pressure to bear to address this situation."

NHS Covid pass needed for nightclubs and large events in Wales

People will have to show a NHS Covid Pass to enter nightclubs and attend events in Wales from next months, the First Minister has announced today.

The measure is being introduced to help control the spread of coronavirus – cases are currently very high in Wales but the alert level will remain at zero for the next three weeks.

Announcing the outcome of the latest three-week review of the coronavirus regulations, Mark Drakeford (pictured) encouraged everyone to work from home whenever possible and to make sure they are fully vaccinated.

Awareness and enforcement of other key coronavirus protection measures, including face coverings in indoor public places and on public transport, will be increased.

First Minister Mark Drakeford said: "Across Wales, coronavirus cases have risen to very high levels over the summer as more people have been gathering and meeting. Tragically, more people are dying from this terrible virus.

"The very strong advice we have from our scientific advisers is to take early action to prevent infections increasing further.

"The last thing we want is further lockdowns and for businesses to have to close their doors once again. That’s why we must take small but meaningful action now to control the spread of the virus and reduce the need for tougher measures later."

The requirement to show an NHS COVID Pass will come into force from October 11. It will mean all over-18s will need to have a NHS COVID Pass to enter:

  • Nightclubs
  • Indoor, non-seated events for more than 500 people, such as concerts or conventions
  • Outdoor non-seated events for more than 4,000 people
  • Any setting or event with more than 10,000 people in attendance

People who are fully vaccinated in Wales can already download the NHS COVID Pass to securely show and share their vaccine status. It also allows people to show they have had a negative lateral flow test result within the last 48 hours.

First Minister Mark Drakeford added: "My message to you today is a simple but serious one – the pandemic is not over and we all need to take steps to protect ourselves and our loved ones.

"We have high levels of the virus in our communities and while our fantastic vaccination programme has helped stop thousands more people from becoming seriously ill or dying, the pressure on the NHS is increasing.

"We hope introducing the requirement to show a COVID Pass will help keep venues and events – many of which have only recently started trading again – open.

"Showing a COVID Pass is already part of our collective effort to keep businesses open with some major events, such as the successful Green Man Festival, using it. We will continue to work closely with all businesses affected to ensure a smooth introduction and operation of this system.

"We want to do everything we can to Keep Wales Safe as we head into the autumn."

Ysgol Dinas Bran goes green to reduce carbon emissions

* The solar panels in place as part of the greening project.

Ysgol Dinas Bran is playing an important role in the drive to reduce carbon emissions impacting on climate change.

The school has a green energy project taking place on site which will help reduce its carbon footprint.

The Greening Ysgol Dinas Bran project is part of Denbighshire County Council’s Climate and Ecological Change Programme. 

Denbighshire declared a Climate Change and Ecological Emergency in July 2019 and has since committed to becoming a Net Carbon Zero and Ecologically Positive Council by 2030.

This includes reducing the council’s emissions from its buildings alongside fleet, waste generated in operations, business travel, staff commuting and street lighting.

The green project at Ysgol Dinas Bran and Llangollen Leisure Centre has seen a 150Kw array of solar panels installed on the school roof which will generate electricity for the school onsite using the suns energy.

Other elements of the work include heating control upgrades and LED lighting. The whole project is expected to reduce the schools carbon emissions by 73 tonnes per year.

The new solar panels went live in August and heating control and LED lighting will all be complete by Christmas.

Cllr Brian Jones the council’s Lead Member for Waste, Transport and the Environment, said: “We are continuing to work on ensuring the council is reducing its carbon footprint and increasing biodiversity in the county.

“This project is a big benefit for reducing carbon and cost whilst at the same time improving the learning environment at the school.”

“We thank the school for working with the council on this important project."

Wednesday, September 15, 2021

Town centre planters to be removed from next Wednesday

 

* The planters along Castle Street.

Workmen are to start removing the social distancing planters from Llangollen town centre starting next Wednesday, says Denbighshire County Council.

In a statement issued this morning (Wednesday) a spokesperson for the council said: “We have booked a contractor in from September 22 to remove the temporary scheme from Castle Street and Abbey Road in order to facilitate the Llangollen 2020 scheme. 

"The work is expected to take a maximum of five days.”

The planters replaced bollards originally put in place by the county council last November.

The temporary measures were part of Local Sustainable Transport scheme to ensure adequate pedestrian space for Covid-19 social distancing.

However, the measures proved unpopular with some local residents and traders and a petition calling for their removal, started by Stuart Davies who has since become a town councillor, gathered hundreds of signatures.

Ruthin rejected similar measures following resistance from the local Member Area Group and similar plans for Denbigh were shelved after public opposition to the idea.

The Llangollen Advocate Facebook group, which has campaigned vigorously against the measures, published details of a series of tripping accidents to pedestrians blamed on the original bollards.

However, the presence of the measures were always strongly defended by the area's two county councillors, Graham Timms and Melvyn Mile, who said last November: "We are both fully behind the Llangollen Covid-19 scheme. Its introduction was to enable people to stay safe when they visit the town, providing space for social distancing and safe queueing outside shops."  

 

Roadworks alert for Horseshoe Pass View

Latest local roadworks alert from one.network is:

Horseshoe Pass View


17 September — 21 September

 

Delays unlikely - Traffic control (give & take)

 

Works description: Boundary box Install 25mm Job in Footway (6mm Bitmac (Tarmac) )...

 

Works location: 11 HORSESHOE PASS VIEW...

 

Public facing description: one.network has automatically assigned a category of Unclassified works to this Works based on the information available. Please note: Works Descriptions are not published by Hafren Dyfrdwy.

 

Responsibility for works: Hafren Dyfrdwy

 

Current status: Advanced planning

 

Works reference: ZU0028102/000060409011